As NesCe Group, we provide strong, planned, and sustainable solutions in water structures and infrastructure projects.
The Erzurum Oltu Şendurak Pond Construction Project carried out by DSI 8th Regional Directorate Erzurum is one of the important investments aimed at meeting the water needs of the region and strengthening infrastructure. Within the scope of the project, pond construction, earthmoving works, and clay layer applications are continuing in a planned manner.
As NesCe Group, we carefully manage field applications, quality control processes, occupational safety, and technical coordination in this project. At every stage of the project, quality, durability, efficiency, and sustainability are prioritized.
Thanks to our strong machinery fleet, experienced technical team, and planned working approach, project processes progress in a controlled and efficient manner. NesCe Group aims to deliver reliable, lasting, and high-standard solutions in this project as well.